Projects

Complete life cycle

Forestalia’s current project portfolio exceeds 6 GW. We are promoted nearly 2.000 MW of renewable energy projects (wind, photovoltaic and biomass). We approach this portfolio during the entire life cycle of the projects:

  • We are promoters: we carry out projects in places with full guarantees of resources, in optimal areas for environmental, social and territorial viability.

  • We structure the business: we establish the necessary alliances to offer the ideal solutions that guarantee economic and financial viability.

  • We supervise construction: through solid strategic, technological and financial alliances, we implement the most appropriate operation model for each case.

  • We manage the asset: we perform the transactions and optimal maintenance of the operations.

    
    

Wind

Forestalia has promoted more than 1500 MW of wind power. It has promoted and participates in the Goya and Phoenix Projects, which add up to around 600 MW.

PV

Forestalia has promoted around 500 MW PV. It is currently building the 48.7 MW El Aliagar Park (San Mateo de Gállego, Zaragoza).

Biomass

The new biomass electricity generation plant in Cubillos del Sil (El Bierzo, León) has come into operation, with an electrical power of 49.5 MWe The project is participated by Forestalia, Somacyl and Sodical.

This plant is supplied with forest biomass, largely from forest cleaning jobs for fire prevention, as well as herbaceous biomass from agricultural operations. The project applies the latest technologies to optimize efficiency and minimize emissions.

In pellet production, Forestalia has Arapellet plant, a leading facility in production capacity in Spain.


Projects

Complete life cycle

Forestalia develops a portfolio of 3.6 GW of renewable energy projects (wind, photovoltaic and biomass). We approach this portfolio during the entire life cycle of the projects:

  • We are promoters: we carry out projects in places with full guarantees of resources, in optimal areas for environmental, social and territorial viability.

  • We structure the business: we establish the necessary alliances to offer the ideal solutions that guarantee economic and financial viability.

  • We supervise construction: through solid strategic, technological and financial alliances, we implement the most appropriate action model for each case.

  • We manage the asset: we perform the operations and optimal maintenance of the actions.

  • 
    

Wind

Forestalia has promoted more than 1500 MW of wind power. It has promoted and participates in the Goya and Phoenix Projects, which add up to around 600 MW.

PV

Forestalia has promoted around 500 MW PV. It is currently building the 48.7 MW El Aliagar Park (San Mateo de Gállego, Zaragoza).

Biomass

The new biomass electricity generation plant in Cubillos del Sil (El Bierzo, León) has come into operation, with an electrical power of 49.5 MWe The project is participated by Forestalia, Somacyl and Sodical.

This plant is supplied with forest biomass, largely from forest cleaning jobs for fire prevention, as well as herbaceous biomass from agricultural operations. The project applies the latest technologies to optimize efficiency and minimize emissions.

In pellet production, Forestalia has Arapellet plant, a leading facility in production capacity in Spain.